Line Changeover / NPI

One ATE, 20 SKUs a Day: Editable Projects and Batch Testing Kill Changeover Downtime

A charger line that builds for ten customers switches products constantly. Every switch means re-configuring the test program by hand — stop the line, open the editor, set limits, hope nobody fat-fingered a threshold. Editable test projects and batch testing are how one ATE runs a mixed lineup without the daily re-setup tax.

If your line builds the same single SKU forever, this article isn't for you. But most contract charger and adapter shops don't. They run a 20W private-label for customer A in the morning, a 65W GaN for customer B after lunch, and a 140W PD3.1 unit for customer C by end of shift. Each product needs its own test program: different protocols, different voltage/current limits, different pass bands. And every time you swap, the test station has to be re-set.

The hidden cost of manual changeover

Re-configuring a test program by hand isn't free. It costs you in three places that never show up on the equipment quote:

  1. Line stop time. The station is idle while someone sets it up — not testing, not earning.
  2. Setup error. A mistyped limit or a wrong protocol selected means units pass that shouldn't, or fail that should. The worst version is silent: a bad setting that lets defects through.
  3. Version drift. Two operators set up "the same" program two different ways, and now your records aren't comparable across batches.

What editable projects + batch testing actually do

Instead of re-building the test configuration every time, you build it once and reuse it. Concretely:

A worked scenario (example assumptions — swap in your real numbers)

Unremarkable example figures to show the shape of the saving:

20 SKUs × 15 min (manual) = ~5.0 hrs idle / shift
20 SKUs × <1 min (saved project) = ~0.3 hrs / shift
Recovered: ~4.7 hrs of test capacity per shift
Be honest with your own numbers. The structure is what matters: every manual changeover is paid for in idle station time and setup risk. An ATE system such as our GTS9881HP platform stores test sequences as editable projects, runs them as batch jobs, and drives the whole thing from a color touchscreen — so a mixed-line shop can switch products without re-engineering the test setup each time. We help define the first set of projects from your product spec during commissioning.